Maintenance of the machine is an extremely important regular work, it should be extremely closely with operations and maintenance, etc., should be seized on duty full-time staff

Investigation.
Machine maintenance:
1, the bearing
Crusher bearing shoulder the entire load of the machine, so good lubrication for the bearing life of a great relationship, it directly affects the life of the machine and transport

Transfer rate, which cylindrical magnets requires injection of lubricating oil must be clean, seal must be good, the machine main oiling Office (1) Turn the bearing (2) roller bearing (3) all teeth

Wheel (4) activities bearing, sliding plane.
2, the newly installed tires prone to loosening must always be checked.
3, pay attention to all parts of the machine is working properly.
4, pay attention to check the wear parts wear, and pay attention to replacement of worn parts.
5, put the event the device chassis plane should go out dust and other materials in order to avoid the machine encounters can not be broken material activities bearings can not move on the bottom shelf, so as to cause

Serious accidents.
6, the bearing temperature rise, the reasons should be eliminated immediately stopped and checked.
7, turning gears in operation should be immediately stopped if the impact of the sound check and eliminate
8, to maintain good lubrication. Sufficient open gear lubricants, bearing cover hole injection, should oiling once every three months.
9, always check cylinder wear layer of loose or falling decapitated Department should be repaired in repair breakage at the tape and the cylinder surface application of sandpaper hit the net,

Then glue prison No. 88, the best and then wire connected together to prevent further off.
10, should be removed pulp bulk magnetic blocks or welding head or something like that, so when the amount of hours to the mine, these things do not come up with, will soon wear out the drum skin.

Profile cylinder iron, through the ends of the parking available observation hole inspection.
11, to the mine before driving water supply, parking in front, the first stop to the mining.
When used for some time the need to disassemble inspection, the first with a small shaft bearing removed, so that it will reveal a small shaft head, with a suitable pipe with diameter

Trap small shaft head, put it on the sleepers, loosen cap screws and remove the cover, to move to one end of the cylinder, magnetic system that is exposed.
Check the bearing is intact, magnets have been damaged, the barrel if there are other things. Need to wet separator replace magnetic blocks, note the pole can not be installed backwards. Each magnet has N

, S two-level, with a string tied down and lift a magnet will find that there is a face always points to the Earth's South Pole, this class is the S-class, the other is N-level

, Make a mark in order to check this bad magnet magnet prevail, according to sex repulsion, opposites attract truth, which determine the level of damage, generally on top of the oblique magnetic

Block is easily damaged. Bad blocks need to be replaced. If the magnet is just cracked without missing pieces, hand and no spare magnetic blocks, magnetic blocks can be surface washed with alcohol or acetone

Net, after continued use with epoxy glue.
Installation commissioning
1, the device should be installed on a level concrete foundation with anchor bolts.
2, the installation should pay attention to the vertical and horizontal main body.
3, after the installation check for loose bolts and various parts of the doors hosts are tightened, if requested to tighten.
4, according to the device configuration of power supply lines and control switches.
5, the inspection is completed, the empty load test, test the normal production.